HomePage >
To Do List > 2008.09
[5th Week]
(Work)
- Frontier valuation material
- [2008.9.29] Collect the experiment results. Make presentation material.
(Personal)
- [2008.9.29~] Start "decision-pray"(?) for two weeks.
- [2008.9.30] Backup Data.. Arrange the desktop.
[4th Week]
(Work)
- Door detect & Find a Door Handle.
- [2008.9.23~26] Complete "doordetect" program in linux. (window -> linux)
- Program the "Category Recognition Online version".
- [2008.9.22] Object Learning and Object CR Test..
- [2008.9.23] Object-CR Parameter Tunning and GC demo with M.S.Kim.
- [2008.9.24] Complete "SmoothFilter-ROI" program in linux. And Integrate "Bumblebee VisionFrame in linux"
(Personal)
- [2008.9.22] Play the game with my brother.
- [2008.9.23] Congratulation party for Woosuk.
[3rd Week]
(Work)
- Door detect & Find a Door Handle.
- [2008.9.17] Complete "doordetect" program in window. ( Matlab -> C )
- Program the "Category Recognition Online version".
- [2008.9.18] Set the Bumblebee linux system with S.S.Y.
- [2008.9.19] Integrate "Bumblebee VisionFrame in linux" and "Object Category Recognition"
(Personal)
- Buy Bicycle Card.
- Do my brother's work.
- Play....Play... Play.. for ...
[1st Week]
(Work)
- [2008.9.1] Help the foreign students.
- [2008.9.1~] Desktop recovery and Data backup.
- [2008.9.2] Make a "Bumblebee Camera Basic Frame Work".
- [2008.9.xx] Survey local features for obeject recognition.
(Personal)
Page was generated in 0.0084 seconds
There are no comments on this page. [Add comment]